CIC39 concrete culvert products: Quality and modern technology
CIC39 Joint Stock Company is a prestigious unit in the field of manufacturing and supplying high quality concrete culverts that meet Vietnamese standards. With more than 32 years of experience, CIC39 has participated in many large-scale construction projects, meeting the technical and progress requirements of investors and customers.
Công ty Cổ phần CIC39
3:50 11/Apr/25
minutes read
Advanced manufacturing technology
CIC39 applies 02 concrete culvert production technologies including Schlosser Pfeiffer technology from the Federal Republic of Germany and centrifugal rotation technology combined with vibration according to French standards, helping the concrete to be evenly distributed from the outside to the inside of the culvert, increasing the tightness and pressure resistance. The automatic electronic aggregate mixing and weighing system ensures the mortar and aggregate components create a uniform quality culvert product.
Product diversity
CIC39 offers a wide range of concrete culverts, including:
- Round culverts : Diameter from ф300 to ф2000, culvert types H10, H30, VH.

Round culvert products
- Box culvert : Size from 1000x1000mm to 3000x3000mm, or according to customer requirements.

Centrifugal concrete box culvert products
The company’s centrifugal concrete culvert products are certified to comply with standards TCVN 9116:2012 (double box culverts) and TCVN 9113:2012 (round culverts).
Modern factory system
CIC39 owns two concrete culvert manufacturing plants:
- Thanh Phuoc Factory : Located at No. 6, Hill 16 Street, Cay Cham Quarter, Thanh Phuoc Ward, Tan Uyen City, Binh Duong Province.
- Long Nguyen Factory : Address 216B, Bung Thuoc Hamlet, Long Nguyen Commune, Bau Bang District, Binh Duong Province.
Both factories are equipped with synchronous production lines, including automatic concrete batching plant system, automatic steel cage welding machine, centrifugal rotating rack combined with vibration and core vibration system according to European standards. Thanh Phuoc factory is conveniently located near Thanh Phuoc port, convenient for transportation by both road and water.
Featured Projects
CIC39 has provided concrete culverts for many large projects, typically the Bau Bang 06 industrial development project. With an area of 45.73 hectares, this project marks the strong development of the Bau Bang industrial area, in addition to providing for key projects such as Long Thanh Airport, Ring Road 3…
With a commitment to quality and product diversity, CIC39 continues to affirm its leading position in the field of concrete culvert manufacturing in the southern provinces of Vietnam.
Share this post:
11/04/2025
News
CIC39 concrete culvert products: Quality and modern technology
CIC39 Joint Stock Company is a prestigious unit in the field of manufacturing and supplying high quality concrete culverts that meet Vietnamese standards. With more than 32 years of experience, CIC39 has participated in many large-scale construction projects, meeting the technical and progress requirements of investors and customers.
29/03/2025
News
Binh Duong allocates 36,000 billion VND in public investment capital in 2025
The People's Committee of Binh Duong province has just decided to allocate VND36,000 billion in public investment capital in 2025, including VND7,132 billion from the central budget and VND28,877.9 billion from the local budget, to implement more than 200 projects focusing on transport infrastructure, health care and education.
10/03/2025
News
Binh Duong: Bright spot for real estate investment at the end of the year
Binh Duong is becoming a bright spot for real estate at the end of the year thanks to its synchronous infrastructure, reasonable prices, attractive investment attraction policies and abundant land funds, while Ho Chi Minh City is facing a shortage of supply. With the role of "industrial capital" and high urbanization rate, Binh Duong strongly attracts FDI capital and is a potential choice for investors.
08/03/2025
News
Admire the 50km long road connecting Binh Duong, Binh Phuoc, Dong Nai about to open the entire route
The Bac Tan Uyen – Phu Giao – Bau Bang dynamic route is nearly 50km long, with more than 36km completed, and the remaining 12km is about to be completed. The entire route is expected to be opened in mid-May. The project will connect Binh Duong, Binh Phuoc and Dong Nai, promoting trade, developing infrastructure and reducing travel time for people and businesses.
06/03/2025
News
CIC39 concrete culvert – Sustainable infrastructure solution with German technology Schlosser Pfeiffer
Discover the CIC39 concrete culvert product manufactured using modern Schlosser Pfeiffer technology from Germany, meeting TCVN 9113:2012, ISO 9001:45001 standards. Effective, sustainable, optimal for infrastructure projects.
05/03/2025
News
High quality concrete bricks – Sustainable construction solutions from CIC39
Providing all kinds of concrete bricks such as 4-hole bricks, solid bricks, block bricks, self-locking bricks, Terrazzo bricks meeting QCVN 16:2017/BXD, TCVN 6477:2016 standards, suitable for many infrastructure and civil works.
04/03/2025
Event
CIC39 completes the expansion and upgrading project of Nguyen Van Cu Secondary School – A new mark for Binh Duong education
CIC39 Joint Stock Company completed the project to upgrade and expand Nguyen Van Cu Secondary School with a scale of 11,238 m², total capital of nearly 90 billion VND, contributing to improving the quality of education in Thu Dau Mot City, Binh Duong.

Contact us
Located in Binh Duong, CIC39 continuously expands its scale and engages in comprehensive partnerships nationwide.